Location
Antalya Airport / Turkey
Customer
TP AO Turkiye Petrolleri A.O.
Kaan Air
Project Date
January 2018 - March 2018
Building Area
3500 m²
Project Type
Aviation Structures
Status
Built.
Turkey has made its biggest geopolitical move in recent years and bought one of the world's largest drilling vessels for oil and gas exploration moves in the Mediterranean. In oil exploration works, the drilling ship called Fatih had to be transported to the ship from Antalya Airport by helicopters, within the shift system, for offshore operations, that is, all materials and personnel.
The project emerged from the necessity of meeting the office needs of the personnel working on the Fatih ship while maintaining the helicopters operating on the offshore line.
The hangar was designed as a steel construction structure with a closed area where 2 AW 169 type helicopters can fit and operation management offices for 45 people in an area of 2000 m2 in the north of the international apron.